Career Overlap Transition record Edition 1 · ESCO v1.2.1
Table 1Transition record

house buildertoresilient floor layer

A house builder already meets 34% of what the resilient floor layer role asks for. The move turns on 10 required skills not yet in the profile.

From house builder
34%
Overlap1
To resilient floor layer
11 Skills carried over
10 Required, not held
64.8 Difficulty2
adjacent 0–30
moderate 30–55
substantial 55–75
career change 75–100
this move, 64.8

This move: 64.8 of 100 · substantial

1 Share of the resilient floor layer role’s weighted skill requirement already met by the house builder profile. Required skills count in full, supplementary skills at 0.35. Directional: the figure for the reverse move differs. 2 Combines what is missing with how specialised it is, so a gap of general skills scores easier than the same number of narrow ones.

Table 2

Table 2 · What you already bring

Of the 11 skills that carry over, these are the ones fewest other occupations ask for. A resilient floor layer role needs them, and most people applying for one will not have them already. This is the part of a house builder background worth leading with.

Skill the target role also needs Area
  • already held cut resilient flooring materials handling and moving
  • already held install laminate floor constructing
  • already held lay resilient flooring tiles constructing
  • already held seal flooring constructing
  • already held create floor plan template handling and moving
  • already held install construction profiles constructing

All 11 carried skills, including the 5 the resilient floor layer role treats as required.

Table 3

Table 3 · What you would need to learn

The 21 missing skills fall into 6 areas of the ESCO skill hierarchy, numbered below in the order worth working in: the areas carrying the most required skills come first, and inside each one the required skills sit above the supplementary ones.

Skill to acquire Tier
01 information skills 3 required, 3 supplementary
  • required, not held interpret 2D plans required
  • required, not held inspect construction supplies required
  • required, not held interpret 3D plans required
  • optional, not held monitor stock level optional
  • optional, not held keep personal administration optional
  • optional, not held keep records of work progress optional
02 constructing 3 required, 2 supplementary
  • required, not held apply floor adhesive required
  • required, not held lay underlayment required
  • required, not held prepare floor for underlayment required
  • optional, not held apply proofing membranes optional
  • optional, not held install insulation material optional
03 handling and moving 2 required, 1 supplementary
  • required, not held mix construction grouts required
  • required, not held transport construction supplies required
  • optional, not held use sander optional
04 assisting and caring 1 required, 1 supplementary
  • required, not held work ergonomically required
  • optional, not held work safely with chemicals optional
05 working with machinery and specialised equipment 1 required, 1 supplementary
  • required, not held use measurement instruments required
  • optional, not held operate wood sawing equipment optional
06 communication, collaboration and creativity 3 supplementary
  • optional, not held demonstrate products' features optional
  • optional, not held advise on construction materials optional
  • optional, not held answer requests for quotation optional
Table 4

Table 4 · Where to start

The 3 entries a resilient floor layer role is least likely to hire without. The ordering is computed from the skill data, not from what pays.

Each entry opens a course search for that skill. Career Overlap earns nothing from these links.

Appendix

Appendix · The rest of the record

All 11 skills that carry over
Skill Type
  • already held create floor plan template skill
  • already held cut resilient flooring materials skill
  • already held follow health and safety procedures in construction skill
  • already held install laminate floor skill
  • already held lay resilient flooring tiles skill
  • already held calculate needs for construction supplies skill
  • already held install construction profiles skill
  • already held order construction supplies skill
  • already held process incoming construction supplies skill
  • already held seal flooring skill
  • already held work in a construction team skill
11 supplementary skills, helpful but not required
Skill to acquire Tier
  • optional, not held demonstrate products' features optional
  • optional, not held monitor stock level optional
  • optional, not held use sander optional
  • optional, not held work safely with chemicals optional
  • optional, not held advise on construction materials optional
  • optional, not held answer requests for quotation optional
  • optional, not held apply proofing membranes optional
  • optional, not held install insulation material optional
  • optional, not held keep personal administration optional
  • optional, not held keep records of work progress optional
  • optional, not held operate wood sawing equipment optional
37 held skills the resilient floor layer role does not ask for
Skill Type
  • not needed by the target role apply roll roofing skill
  • not needed by the target role building codes knowledge
  • not needed by the target role building materials industry knowledge
  • not needed by the target role check compatibility of materials skill
  • not needed by the target role check construction compliance skill
  • not needed by the target role construct wood roofs skill
  • not needed by the target role construction product regulation knowledge
  • not needed by the target role coordinate construction activities skill
  • not needed by the target role create smooth wood surface skill
  • not needed by the target role cut stair carriages skill
  • not needed by the target role design floor skill
  • not needed by the target role energy efficiency knowledge
  • not needed by the target role energy performance of buildings knowledge
  • not needed by the target role ensure compliance with construction project deadline skill
  • not needed by the target role follow safety procedures when working at heights skill
  • not needed by the target role inspect concrete structures skill
  • not needed by the target role inspect roofs skill
  • not needed by the target role install gutters skill
  • not needed by the target role install in-floor and in-wall heating skill
  • not needed by the target role install metal roofing skill
  • not needed by the target role install roof flashing skill
  • not needed by the target role install structural glazing skill
  • not needed by the target role install wood elements in structures skill
  • not needed by the target role lay interlocking roof tiles skill
  • not needed by the target role lay non-interlocking roof tiles skill
  • not needed by the target role maintain construction structures skill
  • not needed by the target role perform roof maintenance skill
  • not needed by the target role plan construction of houses skill
  • not needed by the target role prepare building site skill
  • not needed by the target role prepare roofing materials skill
  • not needed by the target role prepare site for construction skill
  • not needed by the target role prepare surface for hardwood floor laying skill
  • not needed by the target role prepare surface for painting skill
  • not needed by the target role read standard blueprints skill
  • not needed by the target role roofing techniques knowledge
  • not needed by the target role set up temporary construction site infrastructure skill
  • not needed by the target role use safety equipment in construction skill
Index
Note

How this record was compiled

Both occupations are taken from ESCO, which lists the skills and knowledge each occupation is expected to have and marks every one required or optional. Nothing here is a prediction about hiring, and nothing here knows that a particular employer wants a particular certificate. Treat Table 3 as a starting point for your own research rather than a syllabus. The full method states what these figures can and cannot tell you.